Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wilson Boulevard to be completely open for traffic Friday, Dec. 23

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA, UNITED STATES

    11.18.2016

    Video by Sanders Hall 

    Marine Corps Installations East       

    Wilson Boulevard on Marine Corps Base Camp Lejeune will completely open to all traffic beginning Friday, Dec. 23.

    The ten-year, three-phased, $203M project began as an answer to the over-stressed main gate during the USMC Grow the Force initiative in 2006. The network of roads, bridges and an added main gate constitutes more than seven miles of roadway.

    The new roadway named for General Louis Hugh Wilson, Jr., a World War II Medal of Honor recipient and the 26th Commandant of the Marine Corps, will significantly reduce the traffic flow that is currently routed through officer housing from the Wilson Gate, which was opened earlier this year.

    Prior to the new construction, the only way to access the Tarawa Terrace area was via Highway 24. The new gate and road will provide access to emergency services for military families without them having to leave the base. The project also features a safe and separate pedestrian path that parallels the entire length of the roadway to accommodate bicyclists, runners and walkers.

    VIDEO INFO

    Date Taken: 11.18.2016
    Date Posted: 12.14.2016 13:41
    Category: B-Roll
    Video ID: 500244
    VIRIN: 161118-M-OR406-001
    Filename: DOD_103943481
    Length: 00:00:48
    Location: MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA, US

    Video Analytics


    Downloads: 12
    High-Res. Downloads: 12

    PUBLIC DOMAIN