Video B-Roll of the controlled-burn chamber after it arrived at the Port of Natchitoches. The controlled-burn chamber was shipped down river from the Tulsa Port of
Catoosa in Oklahoma. The 436,000-pound chamber will be trucked to Camp Minden, where it will be used to dispose of M6 artillery propellant.
Date Taken: | 02.02.2016 |
Date Posted: | 02.02.2016 13:03 |
Category: | B-Roll |
Video ID: | 448095 |
VIRIN: | 160102-Z-NG364-001 |
Filename: | DOD_103017405 |
Length: | 00:01:00 |
Location: | CAMPTI, LA, US |
Downloads: | 13 |
High-Res. Downloads: | 13 |
This work, Controlled-Burn Chamber Arrives at the Port of Natchitoches, by SSG David Kirtland, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT