Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bird Island Pier Repair Work

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    BUFFALO, NY, UNITED STATES

    10.21.2015

    Video by Andrew Kornacki 

    U.S. Army Corps of Engineers, Buffalo District

    The U.S. Army Corps of Engineers, Buffalo District Floating Plant worked to finish a small section of repair work on the Bird Island Pier, Buffalo, NY that they were not able to finish in 2013, October 21, 2015.

    They placed approximately 200 tons of rubble mound stone in the five ton range on the Niagara River side of the pier to protect the structure and ensure it continues to function as a navigation and recreation structure.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 10.21.2015
    Date Posted: 10.22.2015 11:46
    Category: Package
    Video ID: 429526
    VIRIN: 151021-A-IF251-120
    Filename: DOD_102821008
    Length: 00:01:00
    Location: BUFFALO, NY, US

    Video Analytics


    Downloads: 1
    High-Res. Downloads: 1

    PUBLIC DOMAIN