Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The New Fighter ECP

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    455th Civil Engineering Squadron build a new entry control point (ECP) at the Fighter Ramp at Bagram Airfield. Includes sound bites from Senior Airman Jenny Abbott, Civil Engineering Heavy Equipment Operator.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 04.02.2014
    Date Posted: 04.07.2014 04:12
    Category: Package
    Video ID: 327697
    VIRIN: 140407-F-SZ986-001
    Filename: DOD_101291230
    Length: 00:01:57
    Location: AF
    Hometown: HONOLULU, HI, US

    Video Analytics


    Downloads: 11
    High-Res. Downloads: 11

    PUBLIC DOMAIN