Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
B-roll of the Coast Guard helicopter crew conducting an over flight of the Red River in response to the 2009 Midwest flooding.
Date Taken: |
03.28.2009 |
Date Posted: |
12.17.2013 05:52 |
Category: |
B-Roll |
Video ID: |
314084 |
Filename: |
DOD_101054760 |
Length: |
00:00:35 |
Location: |
US |
Video Analytics
Downloads: |
3 |
High-Res. Downloads: |
3 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS
LEAVE A COMMENT