Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Corps’ construction begins 28 August, 2012, under Sacramento, Calif. high power lines

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    SACRAMENTO, CA, UNITED STATES

    08.28.2012

    Video by Todd Plain 

    U.S. Army Corps of Engineers, Sacramento District

    Three minute video of levee construction work Aug. 28, 2012, along the American River’s north bank between Spanos Court and Campus Commons golf course in Sacramento, Calif. Crews are excavating a haul route next to the levee, which will be used for loading material into trucks at a lower and safer height during construction. Lower loading-heights keeps work safely away from the overhead power lines, which are scheduled to be de-energized during nighttime-only work lasting from September 10-15. Construction of a 900-foot seepage cutoff wall, partially located under the power lines, will commence at that time. This necessary work is a joint flood-risk reduction effort between the Corps’ Sacramento District, the state of California’s Central Valley Flood Protection Board and Sacramento Area Flood Control District. U.S. Army video by Todd Plain.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 08.28.2012
    Date Posted: 09.04.2012 16:01
    Category: B-Roll
    Video ID: 153809
    Filename: DOD_100480971
    Length: 00:03:18
    Location: SACRAMENTO, CA, US

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN