Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Understanding the Savannah Harbor Expansion Project

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    SAVANNAH, GA, UNITED STATES

    10.01.2010

    Video by Sandra Hudson 

    U.S. Army Corps of Engineers, Savannah District

    On Nov. 15, 2010, the U.S. Army Corps of Engineers released the Draft General Re-evaluation Report (GRR) and Environmental Impact Statement (EIS) on a proposal to deepen the Savannah Harbor. The GRR and EIS identify the tentatively selected 47-foot "National Economic Development Plan" and the "Maximum Authorized Depth" Plan of 48 feet and explore the Engineering, Environmental and Economic aspects fo the project. A single plan will be recommended in the final report, which is scheduled for release in the fall of 2011. For more information go to www.sas.usace.army.mil Available in HD. Produced by Sandra Hudson.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 10.01.2010
    Date Posted: 09.29.2011 14:36
    Category: Package
    Video ID: 126733
    VIRIN: 101001-A-ZZ999-001
    Filename: DOD_100251836
    Length: 00:06:10
    Location: SAVANNAH, GA, US

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN