Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wolf Creek Dam Noisy Work Quietly Moves Forward

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    JAMESTOWN, KY, UNITED STATES

    05.31.2011

    Video by Leon Roberts 

    U.S. Army Corps of Engineers, Nashville District

    The U.S. Army Corps of Engineers Nashville District is set to resume work in Critical Area 1 here at Wolf Creek Dam. Critical Area 1 is the area where the earthen embankment wraps around the end of the concrete section of the dam.

    Vertical holes will be drilled to define the edges of the cave and core trench along the alignment of the proposed concrete barrier wall. After testing, the holes will be gravity backfilled with grout to enable safe installation of the barrier wall.

    The subcontractor is mobilizing equipment today into Critical Area 1 and should commence drilling tomorrow. As always, public safety is the top priority and the Corps of Engineers will be monitoring this and all other construction activities closely.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.31.2011
    Date Posted: 06.14.2011 12:07
    Category: Package
    Video ID: 117994
    VIRIN: 110531-A-EO110-025
    Filename: DOD_100190767
    Length: 00:03:14
    Location: JAMESTOWN, KY, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN