Story by Ashley Snipes | Naval Facilities Engineering Systems Command, Officer in Charge of Construction Florence | 12.14.2023
Members of Resident Officer in Charge of Construction Florence Camp Lejeune were able to celebrate the holiday’s a little early with the recent completion of P-1505, the replacement project for two railroad trestles at Queens Creek and White Oak River, as well as the replacement of all railroad ties along the 34 mile line between Marine Corps Base Camp Lejeune and Marine Corps Air Station......
Story by Airman 1st Class Kyrii Richardson | 20th Fighter Wing | 10.06.2023
SHAW AIR FORCE BASE, S.C. – On Oct. 6, 2023, a locomotive dusted the rust off of its gears for its last ride off post, marking the first step towards becoming a historical relic, honoring the proud heritage of the 20th Fighter Wing and its critical role for the last 70 years....
Story by Sandra Wilson | U.S. Army Garrison Benelux | 05.23.2023
After five years of being out of commission, the Eygelshoven Army Depot rail line is now back to full operations.
Story by Scott Sturkol | Fort McCoy Public Affairs Office | 05.22.2023
Staff with the Fort McCoy rail operations team at the Fort McCoy Logistics Readiness Center are supporting their first major rail operation of 2023 with the reception of 210 railcars between May 19-26 at the installation....
Story by Scott Sturkol | Fort McCoy Public Affairs Office | 03.25.2022
Members of the Fort McCoy rail operations team prepared Army locomotives March 14, 2022, for a rail movement for the 485th Engineer Company....
Story by Scott Sturkol | Fort McCoy Public Affairs Office | 04.13.2021
A commercial train rumbles down the tracks March 18, 2021, at Fort McCoy, Wis.
Story by Scott Sturkol | Fort McCoy Public Affairs Office | 11.20.2020
Equipment belonging to the Wisconsin Army National Guard’s 829th Engineer Company (Vertical Construction) is shown on railcars waiting to be unloaded as part of redeployment rail operations Oct. 22, 2020 at Fort McCoy, Wis....
Story by Scott Sturkol | Fort McCoy Public Affairs Office | 11.20.2020
For the many decades of Fort McCoy’s existence, the capability to transport cargo and equipment to and from the installation by rail has always been there, and it’s a capability that will continue, said officials with the installation Logistics Readiness Center Transportation Division....