Photo by Staff Sgt. Garrettgarrett Ralston | 3d Cavalry Regiment Public Affairs Office | 11.26.2010
Soldiers from Troop F and Troop E, 2nd Squadron, 3rd Armored Cavalry Regiment, exchange equipment as part of the arrival of Fox Troop Soldiers to Contingency Operating Base Delta Nov. 27, 2010. Fox Troop will support the advise and assist mission of the 3rd ACR in Wasit as well as enabling the Wasit Provincial Reconstruction Team....
Photo by Staff Sgt. Brien Vorhees | 114th Public Affairs Detachment | 10.01.2009
Members of the Wasit Provincial Reconstruction Team cut the ribbon ath the opening of an engineering college in Kut, Iraq, Oct. 1, 2009. The facilities were constructed with the help of the the Wasit PRT and the Army Corps of Engineers....
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
U.S. Army Maj. Gen. Richard Rowe, Jr., director of the Iraq Transition and Assistance Mission, and the commander of the Iraqi border patrol, tour the Zurbatia Point of Entry facility following a ribbon cutting ceremony near the Iraq-Iran border, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army Corps of......
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
U.S. Army Maj. Gen. Richard Rowe, Jr., director of the Iraq Transition and Assistance Mission, and the Iraqi army's commander of the Iraqi border patrol, tour the Zurbatia Point of Entry facility during a ribbon cutting ceremony near the Iraq-Iran border, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army......
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
U.S. Army Pfc. Bethany Little of Dover Del., attached to the 1st of the 72nd Infantry Brigade, takes pictures during a ribbon cutting ceremony at the Zurbatia Point of Entry facility on the Iraq-Iran border, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army Corps of Engineers for the construction project....
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
Ali Hadi, engineer for the Point of Entry construction project, speaks during a ribbon cutting ceremony at the Zurbatia POE facility on the Iraq-Iran border, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army Corps of Engineers for the construction project....
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
The commander of the Iraqi border patrol does the honors during a ribbon cutting ceremony at the Zurbatia Point of Entry facility on the Iraq-Iran border, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army Corps of Engineers for the construction project....
Photo by Staff Sgt. Brien Vorhees | Joint Combat Camera Center Iraq | 09.26.2009
A crowd of both Iraqis and Americans tour the Zurbatia Point of Entry facility, just feet from the Iraq-Iran border following the facility's ribbon cutting ceremony, Sept. 26, 2009. The Wasit Provincial Reconstruction Team provided quality assurance and quality control in association with the U.S. Army Corps of Engineers for the construction project....