Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    El Dorado Lake environmental assessment, draft master plan available for public comment

    KS, UNITED STATES

    06.10.2021

    Story by Sara Goodeyon 

    U.S. Army Corps of Engineers, Tulsa District

    TULSA, Okla. — The U.S. Army Corps of Engineers (USACE), Tulsa District, hereby informs the public of the release of the 2021 Draft El Dorado Lake Master Plan (hereafter Plan). As well as the associated draft Finding of No Significant Impact (FONSI), and draft Environmental Assessment (EA).

    The Plan is a vital tool produced and used by USACE to guide the responsible stewardship of USACE-administered lands and resources for the benefit of present and future generations. The Plan provides direction for:
    • Appropriate management
    • Use
    • Development
    • Enhancement
    • Protection
    • Conservation of the natural, cultural, and manmade resources at El Dorado Lake.
    It presents an inventory and analysis of:
    • Land resources
    • Resource management objectives
    • Land use classifications
    • Resource use plan for each land use classification
    • Current and projected park facility needs
    • An analysis of existing and anticipated resource use
    • Anticipated influences on overall project operation and management.
    The most current El Dorado Master Plan was approved in 1968 as a supplement to the 1976 Master Plan.
    In lieu of an in-person public meeting because of the COVID-19 Pandemic, USACE will upload a virtual presentation providing an overview of the proposed changes to the current Master Plan and instructions on how to submit comments. A 30-day public comment period is open June 11, 2021 to July 11, 2021.
    The virtual presentation, draft Plan, FONSI, EA, and comment instructions will be available for download June 11, 2021, at: https://www.swt.usace.army.mil/Missions/Recreation/Master-Plans/

    General questions pertaining to the proposed revisions can be directed to Jeff Knack, Chief, Natural Resources and Recreation Branch at Jeff.Knack@usace.army.mil or via phone at (918) 669-7660.
    For questions pertaining specifically to the proposed revision of the El Dorado Master Plan please contact Kevin McCoy, El Dorado, and Marion Assistant Lake Manager, at Kevin.C.McCoy@usace.army.mil or via phone at (620) 382-2101 Comments can be mailed to: El Dorado Lake Manager, 2105 Pawnee Road, Marion, Kansas 66861, or submitted electronically to USACE via email at CESWT-OD-KC@usace.army.mil

    -30-

    LEAVE A COMMENT

    NEWS INFO

    Date Taken: 06.10.2021
    Date Posted: 06.10.2021 16:51
    Story ID: 398631
    Location: KS, US

    Web Views: 65
    Downloads: 0

    PUBLIC DOMAIN