The USACE Buffalo District along with contracting partners, Great Lakes Dock and Materials, LLC, are back to work after the winter break and nearing completion of repairs to the Vermilion East Pier, Vermilion, OH, Apr. 13, 2026.
Over 300 cubic yards of concrete will be poured in the final phases of repairs. In completing this work, the Corps of Engineers is ensuring a safe, quality-built pier, while maintaining the uniqueness of Vermilion Harbor and its importance to the community. (U.S. Army photo by Andre' M. Hampton)
| Date Taken: | 04.13.2026 |
| Date Posted: | 04.17.2026 13:14 |
| Photo ID: | 9622505 |
| VIRIN: | 260412-A-VR700-1003 |
| Resolution: | 4909x3273 |
| Size: | 4.49 MB |
| Location: | VERMILION, OHIO, US |
| Web Views: | 14 |
| Downloads: | 1 |
This work, Vermilion East Pier Concrete Pour [Image 6 of 6], by Andre Hampton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.