Bridge Spans 9 & 10 have been demolished on the State Highway 100 bridge near Gore, Okla., Feb. 10, 2026.
The U.S. Army Corps of Engineers is replacing the bridge, which is connected to Tenkiller Dam and spans the spillway. (U.S. Army Corps of Engineers photo by Raymond Todd)
| Date Taken: | 02.10.2026 |
| Date Posted: | 02.11.2026 15:31 |
| Photo ID: | 9517801 |
| VIRIN: | 260210-A-A5050-1002 |
| Resolution: | 2016x1512 |
| Size: | 962.79 KB |
| Location: | OKLAHOMA, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Work continues on Tenkiller spillway bridge project [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.