NAVFAC Southwest and its partners broke ground on a new Recruit Barracks facility at Marine Corps Recruit Depot San Diego, July 15 in San Diego.
The three-story, 122,601 square-foot recruit barracks facility will feature an open-plan design with reinforced cast-in-place concrete and a stucco exterior. Supporting facilities include utilities, site improvements, parking, signage, demolition, and environmental protection measures.
| Date Taken: | 07.15.2025 |
| Date Posted: | 12.12.2025 14:56 |
| Photo ID: | 9439890 |
| VIRIN: | 250715-N-RA951-9737 |
| Resolution: | 4717x1695 |
| Size: | 2.38 MB |
| Location: | US |
| Web Views: | 4 |
| Downloads: | 2 |
This work, NAVFAC Southwest breaks ground on new Recruit Barracks at MCRD San Diego [Image 3 of 3], by LCDR Edward Cartagena, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.