Water slowly drips from a seep point along the Erie Canal into a steel bowl used by the U.S. Army Corps of Engineers, Buffalo District for annual groundwater sampling for the Formerly Utilized Sites Remedial Action Program Guterl Steel Site in Lockport, N.Y., Sept. 29, 2025. Annual groundwater sampling of the site is conducted to monitor if contamination from the nation’s early atomic energy program is moving offsite and ensure the protection of human health and the environment in the surrounding community. (U.S. Army photo by Avery Schneider)
| Date Taken: | 09.29.2025 |
| Date Posted: | 12.11.2025 11:26 |
| Photo ID: | 9436599 |
| VIRIN: | 250929-A-HB296-1124 |
| Resolution: | 5408x3600 |
| Size: | 3.52 MB |
| Location: | LOCKPORT, NEW YORK, US |
| Web Views: | 2 |
| Downloads: | 1 |
This work, FUSRAP Guterl Steel Annual Groundwater Sampling [Image 27 of 27], by Avery Schneider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.