U.S. Army Corps of Engineers, Europe District Project Engineer Mirela Chirita and a contractor partner check progress on the Deployable Air Base System – Facilities, Equipment and Vehicles (DABS-FEV) storage facilities construction project at Air Base 71 near Campia Turzii, Romania September 17, 2025. The U.S. Army Corps of Engineers is managing a more than $100 million active construction program at the base in close partnership with the Romanian Air Force, the U.S. Air Force and the U.S. Embassy. The projects are intended to bolster regional security by facilitating interoperability, increasing the capacity of these sites and supporting the capability of U.S. forces, NATO allies and partners to rapidly respond to any situation in the region should the need arise. (U.S. Army photo by Rich Puckett)
| Date Taken: | 09.17.2025 |
| Date Posted: | 12.09.2025 10:03 |
| Photo ID: | 9430804 |
| VIRIN: | 250917-A-TX325-2133 |
| Resolution: | 4016x6016 |
| Size: | 2.61 MB |
| Location: | CAMPIA TURZII, RO |
| Web Views: | 6 |
| Downloads: | 1 |
This work, Delivering deterrence infrastructure in Romania [Image 8 of 8], by Richard Puckett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.