Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    District deploys 3-D printed oyster habitat from dredged material [Image 2 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    District deploys 3-D printed oyster habitat from dredged material

    MOBILE, ALABAMA, UNITED STATES

    11.19.2025

    Photo by Keesha Robinson 

    U.S. Army Corps of Engineers, Mobile District

    Blair Morrison, Science and Monitoring Program lead for the Mobile Bay National Estuary Program, holds an oyster at the Mon Louis Beach in Dauphin Island, Alabama, Nov. 19, 2025. The oyster was picked out of a 3-D printed reef that was built from dredged material of the Mobile Bay as part of a collaborative project between the U.S. Army Corps of Engineers, Mobile District, ERDC, and the MBNEP. (U.S. Army photo by Keesha Robinson)

    IMAGE INFO

    Date Taken: 11.19.2025
    Date Posted: 12.02.2025 15:04
    Photo ID: 9417904
    VIRIN: 251119-A-A4477-1001
    Resolution: 5304x3252
    Size: 963.69 KB
    Location: MOBILE, ALABAMA, US

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN