Blair Morrison, Science and Monitoring Program lead for the Mobile Bay National Estuary Program, holds an oyster at the Mon Louis Beach in Dauphin Island, Alabama, Nov. 19, 2025. The oyster was picked out of a 3-D printed reef that was built from dredged material of the Mobile Bay as part of a collaborative project between the U.S. Army Corps of Engineers, Mobile District, ERDC, and the MBNEP. (U.S. Army photo by Keesha Robinson)
| Date Taken: | 11.19.2025 |
| Date Posted: | 12.02.2025 15:04 |
| Photo ID: | 9417904 |
| VIRIN: | 251119-A-A4477-1001 |
| Resolution: | 5304x3252 |
| Size: | 963.69 KB |
| Location: | MOBILE, ALABAMA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, District deploys 3-D printed oyster habitat from dredged material [Image 3 of 3], by Keesha Robinson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.