Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing

    WESTFIELD, MASSACHUSETTS, UNITED STATES

    09.19.2025

    Photo by Airman 1st Class Ellen Ozkaptan 

    104th Fighter Wing

    U.S. Air Force Senior Airman Frederick Calkins, an Airman with the 103rd Civil Engineering Operations Group, uses a leveling rod at Barnes Air National Guard Base, Westfield, Mass., Sept. 19, 2025. Calkins used the leveling rod in order to make sure the foundation of the structure was level before preceeding with pouring cement. (U.S. Air National Guard photo by Airman 1st Class Ellen Ozkaptan)

    IMAGE INFO

    Date Taken: 09.19.2025
    Date Posted: 09.24.2025 13:11
    Photo ID: 9331370
    VIRIN: 250919-Z-JG244-1110
    Resolution: 6048x4024
    Size: 13.93 MB
    Location: WESTFIELD, MASSACHUSETTS, US

    Web Views: 5
    Downloads: 1

    PUBLIC DOMAIN