A member of the 103rd Civil Engineering Operations Group uses an impact driver to secure a nail to a wooden foundation at Barnes Air National Guard Base, Westfield, Mass., Sept. 19, 2025. The 103rd Civil Engineering Operations Group sent their Prime BEEF team, a rapidly deployable engineering team, to help the 104th Fighter Wing with a construction project. (U.S. Air National Guard photo by Airman 1st Class Ellen Ozkaptan)
Date Taken: | 09.19.2025 |
Date Posted: | 09.24.2025 13:13 |
Photo ID: | 9331366 |
VIRIN: | 250919-Z-JG244-1020 |
Resolution: | 6048x4024 |
Size: | 14.95 MB |
Location: | WESTFIELD, MASSACHUSETTS, US |
Web Views: | 4 |
Downloads: | 1 |
This work, The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing [Image 4 of 4], by A1C Ellen Ozkaptan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.