Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing [Image 1 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing

    WESTFIELD, MASSACHUSETTS, UNITED STATES

    09.19.2025

    Photo by Airman 1st Class Ellen Ozkaptan 

    104th Fighter Wing

    Members from the 103rd Civil Engineering Operations Group, measure the area for a static display at Barnes Air National Guard Base, Westfield, Mass., Sept. 19, 2025. Confirming the measurements of the static display base was an important step to insuring the completion of a successful project. (U.S. Air National Guard photo by Airman 1st Class Ellen Ozkaptan)

    IMAGE INFO

    Date Taken: 09.19.2025
    Date Posted: 09.24.2025 13:16
    Photo ID: 9331364
    VIRIN: 250919-Z-JG244-1120
    Resolution: 6048x4024
    Size: 11.81 MB
    Location: WESTFIELD, MASSACHUSETTS, US

    Web Views: 15
    Downloads: 1

    PUBLIC DOMAIN