Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Slide repair [Image 9 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Slide repair

    Jerry Dewitt, operations maintenance specialist, Pine Creek Lake Project Office, Tulsa District, U.S. Army Corps of Engineers, uses the bucket on a tracked dozer to move soil during repair of a slide on the downstream embankment at Pat Mayse Dam near Paris, Texas, Aug. 31, 2025. After grading and preparing the embankment, USACE staff used a soil stabilization machine, lime and water to improve soil conditions and reduce potential for future slides. The slide does not pose a significant risk to the embankment but lack of ground cover increases the likelihood of erosion during rain events necessitating repair.

    IMAGE INFO

    Date Taken: 07.31.2025
    Date Posted: 08.19.2025 08:19
    Photo ID: 9264775
    VIRIN: 250731-A-PO406-9116
    Resolution: 2393x3590
    Size: 3.83 MB
    Location: US

    Web Views: 4
    Downloads: 1

    PUBLIC DOMAIN