A low view of U.S. Army Corps of Engineers, Louisville District's Markland Lock, Aug. 12, 2025 in Warsaw, Kentucky. The primary chamber of the Markland Locks and Dam is fully de-watered for scheduled maintenance. These inspections llows engineers to inspect underwater infrastructure, repair miter gates, and ensure the continued structural integrity of the dam. The Markland facility serves as a vital artery for commercial navigation, supporting the transport of more than 50 million tons of cargo annually.
(U.S. Army Corps of Engineers photo by Charles Delano)
| Date Taken: | 08.12.2025 |
| Date Posted: | 08.13.2025 12:05 |
| Photo ID: | 9254674 |
| VIRIN: | 250812-A-PA223-1055 |
| Resolution: | 2048x1365 |
| Size: | 2.14 MB |
| Location: | WARSAW, KENTUCKY, US |
| Web Views: | 32 |
| Downloads: | 1 |
This work, Markland lock chamber de-watered for maintenance [Image 17 of 17], by Charles Delano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.