A contracted Iraqi worker repairs a leaky waterline as a Baghdad water authority engineer supervises at Joint Security Station Al Khansa in eastern Baghdad, June 2. JSS Al Khansa is one of three water-distribution sites selected to disburse water for 9 Nissan residents beginning around the middle of June. Iraqi security forces at the JSS will provide security for BWA distribution trucks to load water and take it to residents in area muhallas.
| Date Taken: | 06.02.2008 |
| Date Posted: | 06.04.2008 09:45 |
| Photo ID: | 92404 |
| Resolution: | 1750x1314 |
| Size: | 710.82 KB |
| Location: | FORWARD OPERATING BASE LOYALTY, IQ |
| Web Views: | 239 |
| Downloads: | 14 |
This work, Patriot Bde. assists with water distribution project [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.