Maintenance worker Chris Fletcher walks toward the tower for the U.S. Army Corps of Engineers, Baltimore District Stillwater Lake Dam during a site visit in Clifford Township, Pa., June 30, 2025. Stillwater Lake Dam is a 1,700 feet long, gate-controlled, earth-fill structure rising 75 feet above the streambed and reducing flood heights on the Lackawanna River. (U.S. Army photo by Thomas I. Deaton)
Date Taken: | 06.30.2025 |
Date Posted: | 07.28.2025 12:40 |
Photo ID: | 9222437 |
VIRIN: | 250701-A-WK509-1014 |
Resolution: | 3974x5973 |
Size: | 10.73 MB |
Location: | CLIFFORD TOWNSHIP, US |
Web Views: | 3 |
Downloads: | 0 |
This work, Baltimore District leadership visits Stillwater Dam project [Image 22 of 22], by Thomas Deaton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.