A Portable Doppler Radar weather system is lifted by crane to be installed within the U.S. Central Command area of responsibility, July 2, 2025. The installation involved coordinated support from crane crews, logistics teams and airfield management over several weeks. (U.S. Air Force photo by Staff Sgt. James Fritz)
Date Taken: | 07.02.2025 |
Date Posted: | 07.25.2025 05:01 |
Photo ID: | 9203317 |
VIRIN: | 250702-F-NI494-1204 |
Resolution: | 6048x4024 |
Size: | 7.63 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 3 |
Downloads: | 0 |
This work, 22nd ECWS facilitates PDR replacement [Image 13 of 13], by SSgt James Fritz, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.