Stephanie Bozarth, engineer, Tulsa District, U.S. Army Corps of Engineers, helps sequence water releases during a Gate Operational Capabilities Inspection at Hugo Dam, in Hugo, Okla., July 8, 2025. The Hugo Lake Project Office, Infrastructure Branch, Hydrology and Hydraulics Branch, and Broken Bow Powerhouse staff assisted with the GOCI which takes place every five years as part of periodic inspections. (Photo by Charles McDaniel, USACE).
Date Taken: | 07.08.2025 |
Date Posted: | 07.16.2025 12:41 |
Photo ID: | 9182967 |
VIRIN: | 250708-A-A5050-9812 |
Resolution: | 5687x3787 |
Size: | 2.17 MB |
Location: | OKLAHOMA, US |
Web Views: | 20 |
Downloads: | 0 |
This work, Engineers, lake office staff leverage high water, creativity to GOCI Hugo Dam [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.