A tainter gate or radial gate at Hugo Dam is raised to its maximum height during a Gate Operational Capabilities Inspection at Hugo Dam, in Hugo, Okla., July 8, 2025. Engineers and Lake Office staff test gates as part of the five year periodic inspection in addition to the annual inspections and periodic assessments that are performed every 10 years on USACE dams. (Courtesy Photo by Charles McDaniel, USACE)
Date Taken: | 07.08.2025 |
Date Posted: | 07.16.2025 12:41 |
Photo ID: | 9182963 |
VIRIN: | 250708-A-A5050-9810 |
Resolution: | 5712x4284 |
Size: | 2.03 MB |
Location: | OKLAHOMA, US |
Web Views: | 32 |
Downloads: | 0 |
This work, Engineers, lake office staff leverage high water, creativity to GOCI Hugo Dam [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.