Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Double Hybrid Fishway Takes Shape Along Sacramento River in Yolo County [Image 8 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Double Hybrid Fishway Takes Shape Along Sacramento River in Yolo County

    SACRAMENTO, CALIFORNIA, UNITED STATES

    06.05.2025

    Photo by Grant Okubo 

    U.S. Army Corps of Engineers, Sacramento District

    Construction crews work on the fish passage structure along the west bank of the Sacramento River in Yolo County, California, on June 5, 2025. The structure is part of the Sacramento Weir Widening Project managed by the U.S. Army Corps of Engineers Sacramento District, which will create an 8,600-foot "double hybrid technical fishway" for endangered salmon, steelhead and sturgeon. The $350 million project combines flood control infrastructure with fish passage capabilities to protect threatened species during high-water events. Learn more: https://www.spk.usace.army.mil/Missions/Civil-Works/Sacramento-Levee-Upgrades/Sacramento-Weir/
    (U.S. Army photo by Grant Okubo)

    IMAGE INFO

    Date Taken: 06.05.2025
    Date Posted: 06.17.2025 19:04
    Photo ID: 9119912
    VIRIN: 250605-A-QG325-1004
    Resolution: 4263x2839
    Size: 6.75 MB
    Location: SACRAMENTO, CALIFORNIA, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN