Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Out with the Old [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Out with the Old

    HUNTINGDON, PENNSYLVANIA, UNITED STATES

    05.15.2025

    Courtesy Photo

    U.S. Army Corps of Engineers, Baltimore District   

    An old trash rack is hoisted from Raystown Lake and lowered onto the work barge deck as part of ongoing underwater construction operations at the dam's low-level outlet tunnel system. The Tunnel Access Tower is visible in the background. Specialized diving contractors from Marine Diving Solutions are removing old bulkheads and trash racks 170 feet underwater before installing new components to protect the dam's intake systems. The work is part of a $25 million project to replace vertical steel slide gates and supporting infrastructure, with completion scheduled for 2029. (Photo by Brian Glock, U.S. Army Corps of Engineers)

    IMAGE INFO

    Date Taken: 05.15.2025
    Date Posted: 06.10.2025 12:07
    Photo ID: 9099870
    VIRIN: 250515-A-A1420-1002
    Resolution: 4032x3024
    Size: 2.77 MB
    Location: HUNTINGDON, PENNSYLVANIA, US

    Web Views: 15
    Downloads: 1

    PUBLIC DOMAIN