Former U.S. Army Corps of Engineers Sacramento District southern operations branch chief Calvin Foster speaks at the Tule River Spillway Enlargement Project on May 29, 2025. Foster joined USACE as a dam operator at then-Success Dam in 1973 and served the community around the Tule River for 51 years before retiring in 2024. (U.S. Army photo by Samantha Boyle).
| Date Taken: | 05.29.2025 |
| Date Posted: | 06.09.2025 14:03 |
| Photo ID: | 9097480 |
| VIRIN: | 250529-A-VR800-8414 |
| Resolution: | 6000x4000 |
| Size: | 3.87 MB |
| Location: | PORTERVILLE, CALIFORNIA, US |
| Web Views: | 16 |
| Downloads: | 0 |
This work, Success Lake capacity increased with completion of critical flood risk management project [Image 5 of 5], by Samantha Boyle, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.