U.S. Air Force Airmen from the 205th Engineering Installation Squadron, Oklahoma Air National Guard, and the 210th Engineering Installation Squadron, Minnesota Air National Guard, put on Mission Oriented Protective Posture (MOPP) gear in Camp Ripley, Minn., May 2, 2025. Airmen from the 210th and 205th EIS participated in a joint training exercise that prepared them for future missions while simultaneously completing a multi-year project to install fiber optic cable across the installation to enhance range communications.
(U.S. Air National Guard photo by Airman Kaci Brannan)
Date Taken: | 05.02.2025 |
Date Posted: | 05.16.2025 08:20 |
Photo ID: | 9023725 |
VIRIN: | 250502-Z-TX353-1714 |
Resolution: | 5674x3776 |
Size: | 12.01 MB |
Location: | LITTLE FALLS, MINNESOTA, US |
Web Views: | 11 |
Downloads: | 0 |
This work, Double the Squadrons, Double the Readiness [Image 8 of 8], by Amn Kaci Brannan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.