Contractors and spotters work together to guide a huge slab of pre-cast concrete as it is lifted into the air by a 240-foot-tall crane on Marine Corps Base Camp Blaz in late February 2025.
| Date Taken: | 02.24.2025 |
| Date Posted: | 02.26.2025 21:00 |
| Photo ID: | 8888156 |
| VIRIN: | 250225-O-CM160-5339 |
| Resolution: | 6000x4000 |
| Size: | 3.76 MB |
| Location: | GU |
| Web Views: | 17 |
| Downloads: | 1 |
This work, Pre-cast Concrete is Hoisted by a 240-foot Crane During Construction on Marine Corps Base Camp Blaz [Image 5 of 5], by Rachel Landers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.