U.S. Air Force Airman 1st Class Yesieliz Crespo, 51st Logistics Readiness Squadron individual protective equipment journeyman, secures a fabric roof on a shelter system at Osan Air Base, Republic of Korea, Jan. 30, 2024. Each tent provides housing for service members or can be used for other sheltered support functions such as dining or latrine services. Airmen from the 51st LRS and 51st Civil Engineer Squadron worked to secure sustainable temporary housing over two days in support of future exercises. (U.S. Air Force photo by Senior Airman Sabrina Fuller-Judd)
Date Taken: | 01.29.2025 |
Date Posted: | 02.12.2025 18:54 |
Photo ID: | 8868708 |
VIRIN: | 250130-F-BD538-1451 |
Resolution: | 4701x3526 |
Size: | 1.46 MB |
Location: | OSAN AIR BASE, GYEONGGIDO [KYONGGI-DO], KR |
Web Views: | 46 |
Downloads: | 1 |
This work, 51st FW Airmen assemble Shelter Systems, exercise real world beddown capabilities [Image 10 of 10], by SrA Sabrina Fuller-Judd, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.