The bank stabilization portion of the BSNP includes installing stone revetments. The navigation portion covers the routine maintenance of the river to maintain a clear 300-foot wide by 9-foot-deep navigation channel navigation channel and preserve the capability of this inland waterway.
Date Taken: | 08.09.2024 |
Date Posted: | 08.26.2024 12:42 |
Photo ID: | 8609833 |
VIRIN: | 240809-A-OK605-7507 |
Resolution: | 4000x6000 |
Size: | 4.32 MB |
Location: | PARKVILLE, MISSOURI, US |
Web Views: | 17 |
Downloads: | 1 |
This work, USACE Kansas City District’s Bank Stabilization and Navigation Project on the Missouri River [Image 10 of 10], by Samuel Weldin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.