The barge and excavator set-up used by WA Ellis Construction Co. to place reinforcement rock along the shores of the Missouri River as part of the USACE Kansas City District's Bank Stabilization and Navigation Project.
Date Taken: | 08.09.2024 |
Date Posted: | 08.26.2024 12:42 |
Photo ID: | 8609828 |
VIRIN: | 240809-A-OK605-2020 |
Resolution: | 4000x2250 |
Size: | 4.8 MB |
Location: | PARKVILLE, MISSOURI, US |
Web Views: | 11 |
Downloads: | 1 |
This work, USACE Kansas City District’s Bank Stabilization and Navigation Project on the Missouri River [Image 10 of 10], by Samuel Weldin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.