GC Bowers and CSM Nixon receiving design stage (drawings, specifications and design analysis) explanation by Mr. Higaonna, Architectural Engineer.
| Date Taken: | 07.21.2024 |
| Date Posted: | 07.31.2024 22:54 |
| Photo ID: | 8562289 |
| VIRIN: | 240722-A-VF108-1004 |
| Resolution: | 5568x3712 |
| Size: | 3.64 MB |
| Location: | OKINAWA, JP |
| Web Views: | 5 |
| Downloads: | 1 |
This work, Touchpoint 2 Department of Public Works, Engineering Div 4 [Image 11 of 11], by Ichiro Tokashiki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.