Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
Machined Copper CGR-84 Thruster #GRC-C06-KM (Kinetic Metallization)
Issued by: on
Machined Copper CGR-84 Thruster #GRC-C06-KM (Kinetic Metallization)
NASA Identifier: C-2007-278
| Date Taken: |
09.11.2009 |
| Date Posted: |
02.08.2013 13:54 |
| Photo ID: |
849826 |
| Resolution: |
3600x2880 |
| Size: |
5.94 MB |
| Location: |
WASHINGTON, D.C., US |
| Web Views: |
0 |
| Downloads: |
1 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS