Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
J-57 TURBINE FAILURE ENGINE INSTALLED IN THE ALTITUDE WIND TUNNEL AWT
Issued by: on
J-57 TURBINE FAILURE ENGINE INSTALLED IN THE ALTITUDE WIND TUNNEL AWT
NASA Identifier: C-1954-37207
| Date Taken: |
08.27.2009 |
| Date Posted: |
02.08.2013 02:00 |
| Photo ID: |
831592 |
| Resolution: |
3000x2400 |
| Size: |
4.13 MB |
| Location: |
WASHINGTON, D.C., US |
| Web Views: |
13 |
| Downloads: |
2 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS