A 36-inch diameter pile is driven in by a vibratory hammer in support of construction operations for the new Dry Dock 5 project at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility March 18, 2024. The new dry dock is a five-year project that will enhance and maintain the Navy’s capability and capacity to repair, maintain, and modernize Navy fast-attack submarines and surface ships in the region. (U.S. Navy photo by Joel Onemu)
| Date Taken: | 03.18.2024 |
| Date Posted: | 03.28.2024 17:37 |
| Photo ID: | 8312244 |
| VIRIN: | 240318-O-XP232-4730 |
| Resolution: | 7008x4672 |
| Size: | 8.7 MB |
| Location: | HONOLULU, HAWAII, US |
| Web Views: | 150 |
| Downloads: | 7 |
This work, Pearl Harbor Naval Shipyard Dry Dock 5 Construction [Image 7 of 7], by Joel Onemu, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.