Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Pearl Harbor Naval Shipyard Dry Dock 5 Construction [Image 4 of 7]

    Pearl Harbor Naval Shipyard Dry Dock 5 Construction

    HONOLULU, HI, UNITED STATES

    03.18.2024

    Photo by Joel Onemu 

    Naval Facilities Engineering Command Pacific

    The 85-inch diameter pile from the anchoring ceremony is staged for construction operations for the new Dry Dock 5 project at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility March 18, 2024. The new dry dock is a five-year project that will enhance and maintain the Navy’s capability and capacity to repair, maintain, and modernize Navy fast-attack submarines and surface ships in the region. (U.S. Navy photo by Joel Onemu)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.18.2024
    Date Posted: 03.28.2024 17:37
    Photo ID: 8312228
    VIRIN: 240318-O-XP232-5906
    Resolution: 7008x4672
    Size: 9.04 MB
    Location: HONOLULU, HI, US

    Web Views: 25
    Downloads: 4

    PUBLIC DOMAIN