Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo District floating plant preps Barcelona Harbor in Westfield, New York [Image 4 of 5]

    Buffalo District floating plant preps Barcelona Harbor in Westfield, New York

    WESTFIELD, NY, UNITED STATES

    03.05.2024

    Photo by Andre Hampton 

    U.S. Army Corps of Engineers, Buffalo District

    Floating plant/repair fleet crew Jason Lisner and Devin Rapose assist in removing sand from the suface of the sheet pile cell on the breakwater while Derek Myers handles the heavier lifting in the skid steer, Westfield, New York, Mar. 6, 2024. The U.S. Army Army Corps of Engineers, Buffalo District is preparing the surface of the sheet pile cells to drill preliminary holes to collect data that will be provided to our design team to determine the quantities needed for future grouting of the cells to fill any spaces underneath and ensure the stabilization of the structure. (U.S. Army photo by Andre' M. Hampton)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.05.2024
    Date Posted: 03.25.2024 15:13
    Photo ID: 8306318
    VIRIN: 240305-A-VR700-3008
    Resolution: 2048x1365
    Size: 2.11 MB
    Location: WESTFIELD, NY, US

    Web Views: 8
    Downloads: 3

    PUBLIC DOMAIN