Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New construction, construction ops a key contributor to local economic impact by Fort McCoy in recent years [Image 25 of 26]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New construction, construction ops a key contributor to local economic impact by Fort McCoy in recent years

    The construction area for a new $28.08 million barracks building is shown Feb. 28, 2024, at Fort McCoy, Wis., as framing of the building takes place. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 02.28.2024
    Date Posted: 03.05.2024 01:18
    Photo ID: 8270302
    VIRIN: 240228-A-OK556-7296
    Resolution: 5438x3626
    Size: 3.39 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 10
    Downloads: 2

    PUBLIC DOMAIN