Contractors with JMJ Construction of New Lisbon, Wis., along with support from Heritage Movers of Blue River, Wis., move a World War II-era building in the 1600 block on the cantonment area Feb. 24, 2023, at Fort McCoy, Wis. The contractors are relocating and repairing four barracks buildings from the 1600 block of Fort McCoy's cantonment area to alternate locations in the 1700 and 1800 blocks, according to the Fort McCoy Directorate of Public Works. The plan is to relocate the buildings to the new locations before the ground thaws, then lift them onto the new foundations and complete the remaining work by summer 2023. This is the first time in Fort McCoy's history that barracks building are moved like this. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 02.24.2023 |
| Date Posted: | 01.03.2024 15:53 |
| Photo ID: | 8188145 |
| VIRIN: | 230224-A-OK556-8835 |
| Resolution: | 4310x3232 |
| Size: | 1.95 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 8 |
| Downloads: | 6 |
This work, Fort McCoy 2023 year in review: First half of year included historic events, continued construction, winter training [Image 96 of 96], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.