Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Gateway to Installation of the Future nears completion. [Image 3 of 3]

    Gateway to Installation of the Future nears completion.

    PANAMA CITY, FL, UNITED STATES

    12.01.2023

    Photo by christine walker 

    Air Force Installation and Mission Support Center

    Construction on the new Airey Gate at Tyndall Air Force Base, Florida, is nearly 80 percent complete. This main entry control point for the base will be more secure and resilient than previous gates with enhanced force protection characteristics, an overwatch tower to give Defenders more space and time to identify and respond to threats. It is one of three new entry control points under construction at the base designed to meet Florida’s strictest construction standards. The gates will be elevated to avoid storm surge flooding and designed to withstand Category 5 hurricane-force winds. Construction on the Airey Gate is expected to be complete in 2024. (USAF Photo Courtesy Jack Zink)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 12.01.2023
    Date Posted: 01.03.2024 09:51
    Photo ID: 8181741
    VIRIN: 231227-F-QF062-3004
    Resolution: 5184x3888
    Size: 4.98 MB
    Location: PANAMA CITY, FL, US

    Web Views: 11
    Downloads: 1

    PUBLIC DOMAIN