April 26, 2023, all power will be shut off on Fort Carson. Non–critical facilities and housing areas could have power restored within two hours.Critical facilities could be without power for the duration of the eight-hour exercise.
Date Taken: | 04.10.2023 |
Date Posted: | 12.15.2023 09:50 |
Photo ID: | 8168932 |
VIRIN: | 230410-O-UR003-1201 |
Resolution: | 1275x1650 |
Size: | 313.11 KB |
Location: | FORT CARSON, COLORADO, US |
Web Views: | 23 |
Downloads: | 1 |
This work, Black Start Power Outage Exercise Flyer, by John Switzer, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.