Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintenance conducts deep inspection on C-130J aircraft [Image 5 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Maintenance conducts deep inspection on C-130J aircraft

    RAMSTEIN AIR BASE, RHEINLAND-PFALZ, GERMANY

    10.17.2023

    Photo by Senior Airman Thomas Karol 

    86th Airlift Wing

    C-130J Super Hercules compressor variable geometry actuator inner guide vanes are prepared for a deep inspection at Ramstein Air Base, Germany, Oct. 17, 2023. A deep inspection is conducted by maintenance crews who review every piece of the aircraft and they determine if the parts are functional or need to be replaced. This is the second time the 86th Maintenance Group has performed a deep inspection on this type of aircraft at R. (U.S. Air For photo by Senior Airman Thomas Karol)

    IMAGE INFO

    Date Taken: 10.17.2023
    Date Posted: 10.18.2023 09:48
    Photo ID: 8077318
    VIRIN: 231017-F-JM042-1260
    Resolution: 4407x2997
    Size: 3.57 MB
    Location: RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE

    Web Views: 54
    Downloads: 10

    PUBLIC DOMAIN