Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Remediation of contaminated soil near Coldwater Creek [Image 3 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Remediation of contaminated soil near Coldwater Creek

    Black protective material is placed all around the loading area at the remediation site along Coldwater Creek, where contractors performing work for the U.S. Army Corps of Engineers under the Formerly Utilized Sites Remedial Action Program (FUSRAP), Sept. 5, 2023. This safety measure, along with wrapping the wheels of the dump truck, ensures that no potentially contaminated soil is left behind when the work is complete.

    IMAGE INFO

    Date Taken: 09.05.2023
    Date Posted: 09.12.2023 10:12
    Photo ID: 8017754
    VIRIN: 230905-Z-WE840-1320
    Resolution: 4928x3264
    Size: 11.08 MB
    Location: MISSOURI, US

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN