Black protective material is placed all around the loading area at the remediation site along Coldwater Creek, where contractors performing work for the U.S. Army Corps of Engineers under the Formerly Utilized Sites Remedial Action Program (FUSRAP), Sept. 5, 2023. This safety measure, along with wrapping the wheels of the dump truck, ensures that no potentially contaminated soil is left behind when the work is complete.
Date Taken: | 09.05.2023 |
Date Posted: | 09.12.2023 10:12 |
Photo ID: | 8017754 |
VIRIN: | 230905-Z-WE840-1320 |
Resolution: | 4928x3264 |
Size: | 11.08 MB |
Location: | MISSOURI, US |
Web Views: | 18 |
Downloads: | 2 |
This work, Remediation of contaminated soil near Coldwater Creek [Image 10 of 10], by MAJ Jeremy Idleman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.