(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mountlake Terrace Aquatic Ecosystem Restoration Project [Image 2 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Mountlake Terrace Aquatic Ecosystem Restoration Project

    MOUNTLAKE TERRACE, WASHINGTON, UNITED STATES

    08.02.2023

    Photo by Nicole Celestine 

    U.S. Army Corps of Engineers, Seattle District

    A fish weir, an obstruction placed in tidal waters, placed wholly across Ballinger Creek. The weir was installed to capture the fish to be transferred to fish buckets, before dewatering Ballinger Creek, in Ballinger Park, Mountlake Terrace, Washington, as part of the restoration project.

    IMAGE INFO

    Date Taken: 08.02.2023
    Date Posted: 08.02.2023 19:53
    Photo ID: 7949178
    VIRIN: 230716-A-VA654-2899
    Resolution: 2400x1800
    Size: 2.88 MB
    Location: MOUNTLAKE TERRACE, WASHINGTON, US

    Web Views: 15
    Downloads: 3

    PUBLIC DOMAIN