Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mountlake Terrace Aquatic Ecosystem Restoration Project [Image 3 of 11]

    Mountlake Terrace Aquatic Ecosystem Restoration Project

    MOUNTLAKE TERRACE, WA, UNITED STATES

    07.25.2023

    Photo by Nicole Celestine 

    U.S. Army Corps of Engineers, Seattle District

    Photo of foundation pillars for the pedestrian boardwalk installed at Ballinger Park, July 2023, as part of the aquatic ecosystem restoration project at Lake Ballinger, Mountlake Terrace, Washington. Along with the pedestrian boardwalk, the $5.5 million-dollar BIL funded project includes replacing a vehicle crossing, both to ensure access and limit plant damage.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 07.25.2023
    Date Posted: 08.02.2023 19:53
    Photo ID: 7948429
    VIRIN: 230725-A-VA654-5345
    Resolution: 1200x1600
    Size: 2.01 MB
    Location: MOUNTLAKE TERRACE, WA, US

    Web Views: 6
    Downloads: 3

    PUBLIC DOMAIN