Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    219th Engineering Installation Squadron Stays Mission Ready With Tower Rescue Training [Image 1 of 4]

    219th Engineering Installation Squadron Stays Mission Ready With Tower Rescue Training

    TULSA, OK, UNITED STATES

    06.03.2023

    Photo by Airman 1st Class Addison Barnes 

    138th Fighter Wing

    A group of Airmen with the 219th Engineering Installation Squadron prepare for training at the base of an antenna tower in preparation for their training at Tulsa Air National Guard Base, Okla., June 3, 2023. Tower rescue is an annual requirement that the Airmen must pass in order to be mission ready, whether that be at home or at a another country. (U.S. Air National Guard Photo by Airman 1st Class Addison Barnes )

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.03.2023
    Date Posted: 06.04.2023 09:53
    Photo ID: 7835738
    VIRIN: 230603-Z-BX562-1002
    Resolution: 1931x2704
    Size: 1.97 MB
    Location: TULSA, OK, US

    Web Views: 35
    Downloads: 8

    PUBLIC DOMAIN